MTECH Batch 2021: Date of final presentation



MTECH Batch 2021 is informed taht their final presentation is scheduled for 15th April 2024. Copies of reports in the proper format (already specified in pre-project) of at least 45 pages excluding introduction, contents, bibliography, etc have to be deposited in EE office by 12th April. Reports in imporoper format will be rejected. Further, students are enjoined to prepare a pppt of at least 20 slides excluding intro, references, outro, etc. The reports must have hardware/simulation content and the same will need to be justified in presentation